Rated AMBER — Defects logged. The board can house the new LED works.
| GPS (lat, long) | -37.669875, 144.846080 |
| Zone / apron | To be confirmed against apron key-plan |
| Upstream source (parent DB / sub) | To be confirmed against airfield reticulation drawings |
| Inspected | 21–22 June 2026 |
As-built supply and cabling recorded on site. Visual / physical condition audit only — no electrical testing performed.
| Incoming supply & earthing | |
|---|---|
| Supplied from | DB-CCE |
| Upstream feeder | Sub 17A (ESS Tier A6 Item 3 / NE Tier A3 Item 10) |
| Upstream CB | B40 3P (iC60) |
| Upstream CB way(s) | 20, 22, 24 |
| Sub-main cable size | 25mm² 4C+E |
| Phases | 3-phase |
| Line voltage | 400 V (L-L) |
| Phase-earth voltage | 230 V (L-N) |
| Earthing system | Reticulated |
| Upstream protection | Isolator only (no OCPD confirmed at board) |
| Supply cable schedule | |
|---|---|
| Active conductor size | 25 mm² |
| Configuration | 1x4C |
| Conductor arrangement | circular |
| Parallel sets | 1 |
| Conductor material | Copper |
| Insulation / type | UNKNOWN |
| Armour | Unarmoured |
| Installation method | Underground Enclosure |
| Conduit | 50 mm |
| Loaded circuits in conduit | — |
| Estimated depth | — |
| Earth arrangement | Integral — 6 mm² |
| Approx. length | Not recorded |
Scored per the Condition Scoring & Rating Model (six standards-referenced dimensions, 0–4 on the P-scale). Rating is gated — a single safety/structural P2 breach sets RED regardless of the averaged Index.
| Dimension | Score | Grade | Observation |
|---|---|---|---|
| Electrical safety & compliance | 0 | None observed | None observed |
| Structural & enclosure integrity | 1 | Minor (P4) | Enclosure & chassis mechanical integrity |
| Corrosion & protective coating | 1 | Minor (P4) | Corrosion of fixings, bars and coatings; general fouling |
| Ingress protection | 0 | None observed | None observed |
| Access & working space | 0 | None observed | None observed |
| Thermal / fire & component | 0 | None observed | None observed |
Field-observed defect(s) for this board, itemised into discrete findings — each with its own priority and category.
| Ref | Category | Defect | Pri |
|---|---|---|---|
| D-01 | Corrosion | Minor pitting to enclosure / structure | P4 |
| D-02 | Corrosion | Minor surface rust to fixings and bars | P4 |
| D-03 | Housekeeping | Internal dust / dirt accumulation | P4 |
The new LED floodlight load and driver footprint are materially smaller than the legacy HID gear removed, and the existing 3-phase supply, 25 mm² feed and cabinet isolation are adequate for the new works. This conclusion is universal across the fleet and is independent of condition.
9 site photographs. Frames outlined in orange are keyed to a priority defect (fire, structural, access or ingress evidence).