Rated RED. This board is to be replaced by APAM before the works proceed at this pole; the new LED works are to be installed in the replacement board. Field condition records significant structural / enclosure damage and corrosion to fixings and bars.
| GPS (lat, long) | -37.667594, 144.844836 |
| Zone / apron | To be confirmed against apron key-plan |
| Upstream source (parent DB / sub) | To be confirmed against airfield reticulation drawings |
| Inspected | 21–22 June 2026 |
As-built supply and cabling recorded on site. Visual / physical condition audit only — no electrical testing performed.
| Incoming supply & earthing | |
|---|---|
| Supplied from | Northern Apron DB |
| Upstream CB way(s) | — |
| Phases | 3-phase |
| Line voltage | 400 V (L-L) |
| Phase-earth voltage | 230 V (L-N) |
| Earthing system | Reticulated |
| Upstream protection | 63 |
| Supply cable schedule | |
|---|---|
| Active conductor size | 25 mm² |
| Configuration | 1x4C |
| Conductor arrangement | circular |
| Parallel sets | 1 |
| Conductor material | Copper |
| Insulation / type | PVC |
| Armour | Unarmoured |
| Installation method | Underground Enclosure |
| Conduit | 80 mm |
| Loaded circuits in conduit | — |
| Estimated depth | 0.5 m |
| Earth arrangement | Integral — 6 mm² |
| Approx. length | 5 |
Scored per the Condition Scoring & Rating Model (six standards-referenced dimensions, 0–4 on the P-scale). Rating is gated — a single safety/structural P2 breach sets RED regardless of the averaged Index.
| Dimension | Score | Grade | Observation |
|---|---|---|---|
| Electrical safety & compliance | 3 | Major / safety (P2) | Direct-contact / earthing / labelling integrity |
| Structural & enclosure integrity | 3 | Major / safety (P2) | Enclosure & chassis mechanical integrity |
| Corrosion & protective coating | 3 | Major / safety (P2) | Corrosion of fixings, bars and coatings; general fouling |
| Ingress protection | 0 | None observed | None observed |
| Access & working space | 0 | None observed | None observed |
| Thermal / fire & component | 0 | None observed | None observed |
Field-observed defect(s) for this board, itemised into discrete findings — each with its own priority and category.
| Ref | Category | Defect | Pri |
|---|---|---|---|
| D-01 | Structural | Safe-T chassis — structural chassis integrity concern | P2 |
| D-02 | Structural | Pole filler missing | P2 |
| D-03 | Corrosion | Minor pitting to enclosure / structure | P3 |
| D-04 | Corrosion | Minor surface rust to fixings and bars | P4 |
| D-05 | Electrical | Obsolete circuit protection: Terasaki Safe-T MCB/RCD (SRCB2030) and control CBs (TH-5-SE) are no longer manufactured or available. The chassis is obsolete and its circuit protection can no longer be purchased, so the board cannot be re-protected or maintained for the new works. Full board replacement by APAM is required to facilitate the electrical installation and must be completed before the works proceed at this pole. | P2 |
The new LED floodlight load and driver footprint are materially smaller than the legacy HID gear removed, and the existing 3-phase supply, 25 mm² feed and cabinet isolation are adequate for the new works. This conclusion is universal across the fleet and is independent of condition. It does not apply to this board in its present form: the existing board is to be replaced by APAM before the works proceed at this pole, and the new works are to be installed in the replacement board.
15 site photographs. Frames outlined in orange are keyed to a priority defect (fire, structural, access or ingress evidence).