E3D-APAM-RPT-002 · Board Condition Report · Board 23 of 67
DB-D13W
Northern apron board
RED — Major defect
Status: Complete · Condition Index 48.8/100

1. Verdict & suitability

Assessment summary

Can house the new LED luminaires & controlsNO — board to be replaced first
BasisObsolete chassis; circuit protection no longer procurable — see below
Overall condition ratingRED — Major defect
P2
2
P3
1
P4
1
Photos
12
0Condition Index 48.8100

Rated RED. This board is to be replaced by APAM before the works proceed at this pole; the new LED works are to be installed in the replacement board. Field condition records significant structural / enclosure damage and corrosion to fixings and bars.

Replacement required before the works. This board is built on an obsolete Terasaki Safe-T chassis, and the circuit protection it accepts (Safe-T SRCB2030 MCB/RCD and TH-5-SE control CBs) can no longer be purchased. The board therefore cannot be re-protected or maintained for the works, and a chassis and protection-only refurbishment is not possible. This board is to be replaced by APAM to facilitate the electrical installation, before the lighting works proceed at this pole. This is flagged notwithstanding that this report does not otherwise carry remediation recommendations, given the criticality of the airfield lighting supplied.

2. Location

N Apron boards · this board highlighted
GPS (lat, long)-37.667633, 144.844541
Zone / apronTo be confirmed against apron key-plan
Upstream source (parent DB / sub)To be confirmed against airfield reticulation drawings
Inspected21–22 June 2026

3. Supply & electrical

As-built supply and cabling recorded on site. Visual / physical condition audit only — no electrical testing performed.

Incoming supply & earthing
Supplied fromNorthern Apron DB
Upstream CB way(s)—
Phases3-phase
Line voltage400 V (L-L)
Phase-earth voltage230 V (L-N)
Earthing systemReticulated
Upstream protection63
Supply cable schedule
Active conductor size25 mm²
Configuration1x4C
Conductor arrangementcircular
Parallel sets1
Conductor materialCopper
Insulation / typePVC
ArmourUnarmoured
Installation methodUnderground Enclosure
Conduit100 mm
Loaded circuits in conduit1
Estimated depth0.5 m
Earth arrangementIntegral — 6 mm²
Approx. lengthNot recorded

4. Condition assessment

Scored per the Condition Scoring & Rating Model (six standards-referenced dimensions, 0–4 on the P-scale). Rating is gated — a single safety/structural P2 breach sets RED regardless of the averaged Index.

DimensionScoreGradeObservation
Electrical safety & compliance3Major / safety (P2)Direct-contact / earthing / labelling integrity
Structural & enclosure integrity3Major / safety (P2)Enclosure & chassis mechanical integrity
Corrosion & protective coating3Major / safety (P2)Corrosion of fixings, bars and coatings; general fouling
Ingress protection0None observedNone observed
Access & working space0None observedNone observed
Thermal / fire & component0None observedNone observed
Rationale. The gated rating is RED, driven by structural / enclosure damage, an electrical-safety non-compliance and corrosion to fixings and bars (Condition Index 48.8/100). RED reflects a gate breach — a safety/structural P2 or an AS/NZS 3000 Cl 2.10 clearance non-compliance — that cannot be averaged away.

5. Defects

Field-observed defect(s) for this board, itemised into discrete findings — each with its own priority and category.

RefCategoryDefectPri
D-01 Structural Safe-T chassis — structural chassis integrity concern P2
D-02 Housekeeping Internal dust / dirt accumulation P4
D-03 Corrosion Minor pitting to enclosure / structure P3
D-04 Electrical Obsolete circuit protection: Terasaki Safe-T MCB/RCD (SRCB2030) and control CBs (TH-5-SE) are no longer manufactured or available. The chassis is obsolete and its circuit protection can no longer be purchased, so the board cannot be re-protected or maintained for the new works. Full board replacement by APAM is required to facilitate the electrical installation and must be completed before the works proceed at this pole. P2

6. Suitability for the LED works

Suitability for LED worksREPLACE BOARD FIRST

The new LED floodlight load and driver footprint are materially smaller than the legacy HID gear removed, and the existing 3-phase supply, 25 mm² feed and cabinet isolation are adequate for the new works. This conclusion is universal across the fleet and is independent of condition. It does not apply to this board in its present form: the existing board is to be replaced by APAM before the works proceed at this pole, and the new works are to be installed in the replacement board.

7. Photographic evidence

12 site photographs. Frames outlined in orange are keyed to a priority defect (fire, structural, access or ingress evidence).

Site photo
Site photo #1
Site photo
Site photo #2
Site photo
Site photo #3
Site photo
Site photo #4
Site photo
Site photo #5
Site photo